Publicações

[Revistas | Conferências | Notas de workshops ]

Dissertação

Paulo Sousa (2000), Agentes Inteligentes em Sistemas Holónicos de Produção. Tese de Doutoramento, Universidade do Minho. 

Revistas Científicas

Paulo Sousa, Carlos Ramos, e José Neves (2000), Manufacturing Entities with Incomplete Information. Studies in Informatics and Control Journal, vol. 9, nº. 2, pp.79-88, Junho 2000. National Institute for R&D in Infomatics. Roménia. 

Paulo Sousa, Nuno Silva, Tapio Heikkila, Martin Kallingbaum e Paul Valcknears (2000), Aspects of Co-operation in Distributed Manufacturing Systems. Studies in Informatics and Control Journal, vol. 9, nº. 2, pp.89-110, Junho 2000. National Institute for R&D in Infomatics. Roménia.

Paulo Sousa e Carlos Ramos (1999), A Distributed Architecture and Negotiation Protocol for Scheduling in Manufacturing Systems. Computers in Industry - special issue on Life Cycle Approaches to Production Systems: Management, Control and Supervision, vol. 38 n.º 2, pp.103-113, Março de 1999. Elsevier. ISSN 0166-3615.

Paulo Sousa e Carlos Ramos (1998), A Dynamic Scheduling Holon for Manufacturing Orders. Journal of Intelligent Manufacturing - special issue on Agent-based Manufacturing, vol. 9 n.º 2, pp. 107-112, Abril de 1998. Chapman & Hall. ISSN 0956-5515.

Actas de Conferências Internacionais

Paulo Sousa, Carlos Ramos, e José Neves (1999), Manufacturing Entities with Incomplete Information. Proceedings of the 2nd International Workshop on Intelligent Manufacturing Systems (IMS-Europe'99), pp. 185-193. Leuven, Bélgica, 22 a 24 de Setembro 1999. (zipped PS - 265Kb; slides - 72Kb)

Paulo Sousa, Carlos Ramos e José Neves (1999), Contracting Tasks Between Autonomous Resources – An application to dynamic scheduling of manufacturing orders. Proceedings of The Practical Application of Agents and Multi-Agents Technologies (PAAM’99), pp. 345-362. Londres, Reino Unido, 19 a 21 de Abril de 1999. (zipped PS - 286Kb; slides - 106Kb)

Nuno Silva, Paulo Sousa e Carlos Ramos (1998), Proposal for a Dynamic Scheduling Architecture and Algorithm using an Holonic Approach. IFAC - Intelligent Manufacturing Systems 98. Gramado, RS, Brasil, 10 a 12 de Novembro de 1998.

Nuno Silva, Paulo Sousa e Carlos Ramos (1998), A Holonic Manufacturing System Implementation. Proceedings of the Advanced Summer Institute (ASI'98). Bremen, Alemanha, 14 a 17 de Junho de 1998.

Paulo Sousa e Carlos Ramos (1998), Scheduling Using Negotiation Between Resources and Tasks. Proceedings of the First International Workshop on Intelligent Manufacturing Systems (IMS-Europe’98), pp. 479-490. Lausanne, Suíça, 15 a 17 de Abril de 1998.

Paulo Sousa e Carlos Ramos (1997), A Distributed Architecture and Negotiation Protocol for Scheduling in Manufacturing Systems. Proceedings of the Advanced Summer Institute (ASI’97). Budapeste, Hungria, 14 a 18 de Julho de 1997.

Paulo Sousa e Carlos Ramos (1997), A Dynamic Scheduling Holon for Manufacturing Orders. Proceedings of the Intelligent Manufacturing Processes & Systems (IMP&S’97), pp. 542-547. Budapeste, Hungria, 10 a 13 de Junho de 1997.

Paulo Sousa e Carlos Ramos (1997), Proposal of a Scheduling Holon for Manufacturing. Proceedings of The Practical Application of Agents and Multi-Agents Technologies (PAAM’97), pp. 255-268. Londres, Reino Unido, 21 a 23 de Abril de 1997.

Notas de Workshops

Paulo Sousa e Carlos Ramos (1998), A Negotiation-Based Scheduler for Manufacturing Systems. Working notes of the workshop on Agent Based Manufacturing at the Second International Conference on Autonomous Agents (Agents’98); Minneapolis/Saint Paul, Minnesota, EUA, 9 a 13 de Maio de 1998.

Carlos Ramos e Paulo Sousa (1996), Scheduling Orders in Manufacturing using a Holonic Approach. Proceedings of the European Workshop on Agent-Oriented Systems in Manufacturing, pp. 80-85. Berlim, Alemanha, 26 e 27 de Setembro de 1996.

(c) 1999-2002, Paulo Sousa
comentários e sugestões
Criação: 8 de Outubro de 1999
Ultima Alteração: 17 de Janeiro de 2002